Sunday, 6 May 2012

Trevor G's '53 Chop part 2

Tacked the "b" pillar in
Door top tacked in
Stand back and have a look
Trevor D came by for a visit
Other side "b" pillar and door top tacked in
Cut the back window free so it can be bent down to meet the roof
Clamped in place to see how it flows
Push it outside for a look
Relief cut the roof and tack the back window in

Saturday, 10 March 2012

Trevor G's '53 Update #1

Trevor's Chevy is coming along nicely, MustangII front suspension is installed, the front of the frame is Z'd, motor and 700R4 transmission are mounted and the driveshaft is in, and the steering column has been modified and hooked up to the rack and pinion. Next up is fabricate and install transmission tunnel and driveshaft tunnel and build a new trunk floor. I helped pull out the headliner and glass today getting ready to chop the roof.

Sunday, 26 February 2012