Saturday, 10 March 2012

Trevor G's '53 Update #1

Trevor's Chevy is coming along nicely, MustangII front suspension is installed, the front of the frame is Z'd, motor and 700R4 transmission are mounted and the driveshaft is in, and the steering column has been modified and hooked up to the rack and pinion. Next up is fabricate and install transmission tunnel and driveshaft tunnel and build a new trunk floor. I helped pull out the headliner and glass today getting ready to chop the roof.

No comments:

Post a Comment